An artificial river nearly as long as Cauto and two times the size of Zaza, is being drawn in the island’s belly in such a silent manner, that the magnitude of the work is hardly revealed, not even for those involved in the undertaking. The building works are scheduled to be concluded in 2022.»
Escambray ENGLISH EDITION
